Every trade. One site management.

08 / 10
Bathroom renovation Geneva
The most technical room in an apartment, because everything depends on waterproofing. Full strip-out, waterproofing under the tiles, reworked drainage, then tiling and sanitary ware.
- Full strip-out down to the substrate
- Waterproofing under tiles, walk-in showers included
- Reworking of drainage and supply pipes
- Wall and floor tiling
- Installation of sanitary ware and taps
- Ventilation, lighting and finishing joints
Apartments · Villas · Hotels
10 / 10
Construction management
You already have your contractors, or your architect, and you are missing someone on site. We keep the schedule, the accounts and the quality of execution, and we are your single point of contact with everyone involved.
- Tendering and comparison of bids
- Overall schedule and coordination of trades
- Site visits and meeting minutes
- Cost control and approval of progress claims
- Quality control of execution
- Handover of works and warranty follow-up
Buildings & condominiums · Property managers · Shops
03 / 10
Demolition
Selective removal or full strip-out, with protection of the parts being kept and sorting of materials. In an occupied building, the question is not how to demolish but how to do it without dirtying the landings or disturbing the neighbours.
- Selective removal: floors, partitions, bathrooms, kitchens
- Full strip-out before major renovation
- Protection of entrances, landings and lifts
- Sorting of materials and disposal through approved channels
- Asbestos survey before work on older buildings
- Final cleaning and restoration of access areas
Apartments · Villas · Commercial premises
09 / 10
Energy renovation Geneva
Insulation, windows and heat generation, handled together rather than one item at a time. The order of the works changes the result: insulating before resizing the heating avoids paying for an oversized system.
- Building envelope insulation: façades, roof, slabs
- Window replacement and airtightness
- Coordination of the heating system replacement
- Sequencing the works so the heating is not oversized
- Technical file for cantonal subsidies
- Monitoring of energy use after the works
Villas · Buildings & condominiums

01 / 10
General renovation
We take on the whole job: strip-out, structural work, fit-out, finishes, and the coordination of every trade through to handover. One point of contact, one quote, one party responsible — rather than seven firms to chase and delays that add up.
- On-site survey and fixed quote, item by item
- Demolition and removal, sorting of site waste
- Masonry, partitions, screeds and insulation
- Electrical and plumbing, coordinated with your installers
- Flooring, plasterwork, painting and joinery
- Weekly schedule and joint handover inspection
Apartments · Villas · Buildings & condominiums

04 / 10
Insulation & façades
External wall insulation, render and façade painting. It is the item that changes the heating bill the most, and the one where the execution detail — thermal bridges at window reveals — decides the real result.
- External wall insulation, mineral or synthetic render
- Treatment of thermal bridges at reveals and parapets
- Render repairs and façade painting
- Scaffolding and site protection
- Connecting flashings and sills
- Technical file for cantonal subsidies
Villas · Buildings & condominiums

06 / 10
Interior renovation Geneva
Reconfiguring spaces, floors, walls and interior joinery. Often the starting point of a renovation: you set out to change one room, and the survey shows what makes sense to do at the same time.
- Reconfiguring partitions and openings
- Parquet, tiling and resilient flooring
- Interior doors and bespoke joinery
- Plastering and painting throughout
- Electrical upgrade and lighting
- Coordination with your kitchen fitters and suppliers
Apartments · Villas · Condominiums

07 / 10
Kitchen renovation Geneva
Removal of the old kitchen, floor and wall repairs, relocation of water and electrical supplies, then installation. The units come from your kitchen supplier or ours: what matters is that the surfaces are true and the supplies in the right place before delivery.
- Removal and disposal of the existing kitchen
- Relocation of water supplies, drains and sockets
- Floor, wall and splashback repairs
- Installation of units and appliances
- Plumbing and electrical connections
- Sealing, silicone joints and commissioning
Apartments · Villas · Condominiums
02 / 10
Masonry & fit-out
Openings, structural repairs, partitions, screeds and tiling: everything that gets built before the finishes. It is the stage where unpleasant surprises cost the most, and so the one where a prior survey matters most.
- Opening and reworking of load-bearing walls, with an engineer's study where needed
- Partitions, wall linings and suspended ceilings
- Screeds, levelling and waterproofing
- Wall and floor tiling, large formats included
- Concrete repairs, thresholds and sills
- Removal and cleaning at the end of each phase
Villas · Buildings · Shops

05 / 10
Plastering & painting
Ceilings, lightweight partitions, skim coats and painting. It is the work everyone sees, and so the one the whole project is judged by: a poorly prepared wall shows under raking light, whatever the quality of the paint.
- Plasterboard partitions and ceilings
- Skim coating and surface preparation
- Interior painting, walls and ceilings
- Treatment of cracks and damp-damaged areas
- Cornices and technical suspended ceilings
- Protection of floors and retained joinery
Apartments · Villas · Offices
Included in every project.
A single point of contact
One site manager leads every trade. You only have one number to call.
Fixed price, item by item
The quote details every line. The agreed price is the price you pay.
A clean site
Protection laid every morning, cleaning every evening — including in occupied homes.
Handover together
We go over the finishes with you. Whatever needs redoing is redone.